If you liked the page, then share them with your friends via Facebook or Twitter.
Road construction
B 7 - B 87 junction system at Umpferstedt site
Renovation and reconstruction of B 7/ B 87 junction system (without closing it to traffic) and development of the B 87 (free stretch) – as first construction phase at Umpferstedt - Mellingen (approx. 1.2 km)
B 7, Mönchenholzhausen - Nohra
Development of B 7 for approx. 4.2 km (resurfacing, incl. gradient improvement and building new cycle path at the Utzberg junction)
B 85 Holzdorf - Legefeld
Development of B 85 - BAB feeder to A4 – for approx. 1.1 km (development of the main road, including roundabout at Legefeld industrial park, development of Holzdorf junction and 0.8 km of new cycle path)
B 85 OD Weimar Rudolf-Breitscheid-Straße - Berkaer Straße
Development of B 85 - local through traffic to Weimar - R. - Breitscheid Straße/Berkaer junction approx. 400 metres including traffic light equipment, redevelopment of mixed water channel (stone, egg shape), supply lines and ancillary plant
Development of B 87 Mellingen - Umpferstedt, 2nd construction stage
Development of the B 87 (free stretch) - Umpferstedt-Mellingen (for approx. 1.9 km)